Ca Mau Power Plant
U Minh district, Ca Mau province,
Vietnam
- Including two power plants with the capacity of each of 750 MW for gas and 669,8 MW for oil DO
- Total working area: ~ 30 ha
- Construction status: finished in 2008
Location
Main Application
Industrial Structures
Project participants
Main Contractor: LILAMA
Sub-contractor: VINCI
Sub-contractor: VINCI
Field Service
PERI Malaysia
The Project
Impressions from the project process
The project had different construction element shapes with thick and straight walls
The system provided a safe climbing formwork solution on site
The thick wall sections and columns could be economically constructed with the TRIO panel formwork.
For the high and massive reinforced concrete walls, the TRIO was extended and supplemented with TRIO concreting platforms. It provided safe access to all working areas.
The project had different construction element shapes with thick and straight walls
The system provided a safe climbing formwork solution on site
The thick wall sections and columns could be economically constructed with the TRIO panel formwork.
For the high and massive reinforced concrete walls, the TRIO was extended and supplemented with TRIO concreting platforms. It provided safe access to all working areas.