Ho Chi Minh Metro Line 1: Ben Thanh - Suoi Tien
Ho Chi Minh City,
Vietnam
- The line No. 1 consists of 14 stations and 19.7 km length with 2.6km underground- and 17.1km elevated section
- The introduction of this metro line will see the central districts of HCMC linked directly with the eastern parts of the city such as District 2, District 9 and Thu Duc District.
- Construction status: in progress
Location
Main Application
Civil Engineering
Project participants
Main Contractor: SUMITOMO -CIENCO 6 Corp.
Sub-contractor: HOA BINH Corp.
Customer: LOTUS Greentech Co.
Sub-contractor: HOA BINH Corp.
Customer: LOTUS Greentech Co.
Field Service
PERI Asia PTE LTD.
The Project
Impressions from the project process
The 1st metro in HCMC-Line No.1 starts at the Ben Thanh Market and ends at Suoi Tien Park.
In order to protect the existing water pipes along the Xa Lo Ha Noi highway. suspened PERI VARIOKIT Trusses are being used for forming the concourse levels.
Customized VARIOKIT Trusses are suspended from the pier caps by four DW26 tie rods to support a maximum load of 50t without any shoring to the ground.
The entire system has successfully met the contractor's requirement for safe construction within the tight working area.
MULTIFLEX Girder Slab formwork with MULTIPROP shores are being applied for forming the slab.
The introduction of this metro line will see the central districts of HCMC linked directly with the eastern parts of the city such as District 2, District 9 and Thu Duc District.
Much of the construction is being implemented adjacent to the existing highway with daily heavy traffic.
The 1st metro in HCMC-Line No.1 starts at the Ben Thanh Market and ends at Suoi Tien Park.
In order to protect the existing water pipes along the Xa Lo Ha Noi highway. suspened PERI VARIOKIT Trusses are being used for forming the concourse levels.
Customized VARIOKIT Trusses are suspended from the pier caps by four DW26 tie rods to support a maximum load of 50t without any shoring to the ground.
The entire system has successfully met the contractor's requirement for safe construction within the tight working area.
MULTIFLEX Girder Slab formwork with MULTIPROP shores are being applied for forming the slab.
The introduction of this metro line will see the central districts of HCMC linked directly with the eastern parts of the city such as District 2, District 9 and Thu Duc District.
Much of the construction is being implemented adjacent to the existing highway with daily heavy traffic.
Mr Le Tan Dat
Project Site Manager
PERI has provided us with good products and a customized solution to meet our technical requirements. Besides that, we are satisfied with the engineering support and formwork supervision at the jobsite.