Nam Ngiep Hydro Power Plant 1
Bolikhamxay and Xaysomboun provinces,
Laos
- Including two dams and power stations with the main dam's height of 148 m and the total capacity of 290 MW
- Construction status: in progress
Location
Main Application
Industrial Structures
Project participants
Main Contractor: OBAYASHI Corp.
Sub-contractor: SONG DA 5 Co.
Sub-contractor: SONG DA 5 Co.
Field Service
PERI Asia PTE LTD.
The Project
Impressions from the project process
The CB Climbing System was successfully applied and increased the productivity at site.
PERI Birch panels for a good concrete surface and many re-useable times
The panels were tailored and then moved by crane to concreting area with large-sized units.
The product usage was carefully instructed to the users by PERI formwork supervisors on site.
The project includes two dams and power stations with the main dam's height of 148 m and the total capacity of 290 MW
Combination of the VARIO GT 24 wall and CB climbing scaffold for an economical formwork solution supporting height of 29 m and wall-thickness of 2 - 2.5 m
The CB 240 climbing scaffold, combined with VARIO GT 24 girder wall formwork, was used for constructing the massive power plant walls.
The units, consisting of formwork and scaffolding, can be quickly moved by crane to the next concreting cycle.
PERI solution for safe working areas
PERI solution for safe working areas
The ST100 shoring system met the current requirements of the project.
The CB Climbing System was successfully applied and increased the productivity at site.
PERI Birch panels for a good concrete surface and many re-useable times
The panels were tailored and then moved by crane to concreting area with large-sized units.
The product usage was carefully instructed to the users by PERI formwork supervisors on site.
The project includes two dams and power stations with the main dam's height of 148 m and the total capacity of 290 MW
Combination of the VARIO GT 24 wall and CB climbing scaffold for an economical formwork solution supporting height of 29 m and wall-thickness of 2 - 2.5 m
The CB 240 climbing scaffold, combined with VARIO GT 24 girder wall formwork, was used for constructing the massive power plant walls.
The units, consisting of formwork and scaffolding, can be quickly moved by crane to the next concreting cycle.
PERI solution for safe working areas
PERI solution for safe working areas
The ST100 shoring system met the current requirements of the project.
Pham Van Bac
Site Engineer (Song Da 5 Co.)
The PERI VARIO GT 24 wall formwork and ST 100 shoring system already met the current requirements of the project. These systems were safe for using, worked well under every environment and weather conditions. The simple assembly as well as dismantling of the systems not only reduced the labor requirement and increased the productivity at site. But it also helped the delivery to the remote locations. Besides that, the continued technical support from PERI team was very helpful during the concreting time. PERI has provided us the professional services and the high-quality products.