The 2nd cable stayed bridge in Haiphong City and was built by Finland, Denmark and Vietnam.
It features a span of 240m with one pylon carrying the main span of 120m and the nearest side span of 70m, and has 4 lanes and pavements in each direction.
VARIO GT 24 system on site
The 2nd cable stayed bridge in Haiphong City and was built by Finland, Denmark and Vietnam.
It features a span of 240m with one pylon carrying the main span of 120m and the nearest side span of 70m, and has 4 lanes and pavements in each direction.