Saigon Centre Phase 2 Complex Building
District 1, Ho Chi Minh city, Vietnam
- Located on Le Loi Boulevard, in central District of Ho Chi Minh City
- Height: 192 m
- Storey: 43 floors
- Construction status: in process
Location
Main Application
Skyscrapers and Towers
Project participants
Main Contractor: SEOBO
Sub-contractor: HOA BINH Corp.
Sub-contractor: HOA BINH Corp.
Field Service
PERI Korea
The Project
Impressions from the project process
It is located in Le Loi Boulevard, District 1, Ho Chi Minh City, and will have the height of 192 m with 43 floors.
Together with Bitexco Buiding, Saigon Time Squares and Vietinbank Branch 1 Tower, Saigon Centre shapes the Skyline of Ho Chi Minh City.
All components were assembled on the ground in a tight working area and moved to high construction by crane.
prepared for crane
The RCS climbing protection panel provided site personnel the highest levels of safety.
The RCS climbing protection panel completely enclosed the slab edges of the upper floors under construction.
RCS system provided the fast and safe construction progress in a tight area and on the high level.
The enclosure with the RCS climbing protection panel provided ideal protection for site personnel.
Though the construction is taking place within a crowed residential area, but the RCS-P system of PERI ensures a safe working place for site personnel and helps the construction not to disturb the residents around.
It is located in Le Loi Boulevard, District 1, Ho Chi Minh City, and will have the height of 192 m with 43 floors.
Together with Bitexco Buiding, Saigon Time Squares and Vietinbank Branch 1 Tower, Saigon Centre shapes the Skyline of Ho Chi Minh City.
All components were assembled on the ground in a tight working area and moved to high construction by crane.
prepared for crane
The RCS climbing protection panel provided site personnel the highest levels of safety.
The RCS climbing protection panel completely enclosed the slab edges of the upper floors under construction.
RCS system provided the fast and safe construction progress in a tight area and on the high level.
The enclosure with the RCS climbing protection panel provided ideal protection for site personnel.
Though the construction is taking place within a crowed residential area, but the RCS-P system of PERI ensures a safe working place for site personnel and helps the construction not to disturb the residents around.