Thai Binh Thermal Power Plant 1
Thai Thuy district, Thai Binh province,
Vietnam
- Including two items with the total capacity of 600 MW
- Construction area: 115 ha
- Construction status: in progress
Main Application
Industrial Structures
Project participants
Main Contractor: MARUBENI Corp.
Main Contractor: TOA Corp.
Main Contractor: BACH DANG Co.
Customer: NIKKEN Vietnam
Main Contractor: TOA Corp.
Main Contractor: BACH DANG Co.
Customer: NIKKEN Vietnam
Field Service
PERI Asia PTE LTD.
The Project
Impressions from the project process
The 6.9x2.4m VARIO GT 24 Formwork Panel was been pre-assembled and then easily moved by crane to the constructing area.
VARIO GT 24 is flexibly used for any construction types, for columns or corner-walls
Formwork panels pre-assembled on site
With less and simple components, PERI VARIO GT 24 system was efficiently used for concreting many elements of project.
Suitable solution with VARIO GT 24 wall formwork
Customized VARIO GT 24 formwork panel
PERI system provided safe solution for concreting plattform with GB 80.
With PERI formwork solution, the construction was successfully completed.
The 6.9x2.4m VARIO GT 24 Formwork Panel was been pre-assembled and then easily moved by crane to the constructing area.
VARIO GT 24 is flexibly used for any construction types, for columns or corner-walls
Formwork panels pre-assembled on site
With less and simple components, PERI VARIO GT 24 system was efficiently used for concreting many elements of project.
Suitable solution with VARIO GT 24 wall formwork
Customized VARIO GT 24 formwork panel
PERI system provided safe solution for concreting plattform with GB 80.
With PERI formwork solution, the construction was successfully completed.
Vu Thanh Nam
Deputy Project Director of Bach Dang JSC.
It was a flexible formwork system and fit to every application with the simple assemblability.Our workers can use the products smoothly after a short training time. Due to fast assembling time and simple working process with crane, it helped us shorten down the schedule in a half in comparison with the conventional formworks. Accordingly, we can reduce the labor-cost as well as ensure their health during working.The professional engineers of PERI also provided us much support during the construction.